Track record
Projects
Production with a strong R&D component · Project owner advisory
Answering tenders in two days instead of three weeks
- Problem
- Long responses to produce, despite a wealth of past answers.
- Approach
- An AI assistant built from past responses.
- Result
- 3 weeks → 2 days
Hard problems · Biotech
Choosing the next experiments instead of guessing them
- Problem
- Finding the right parameters takes many rounds of experiments.
- Approach
- Model past experiments to choose the next parameters to test.
- Result
- Targeted experiments, validation underway
Hard problems · Robotics · Research
Proving that a robot cannot reach its target
- Problem
- Knowing for certain that a robotic arm cannot reach an object.
- Approach
- Checkable mathematical proofs, on a 7-joint industrial arm.
- Result
- Open-access paper
Hard problems · Media economics
Modeling a single subscription to the entire French press
- Problem
- Stacking subscriptions puts readers off, and AI is cutting traffic.
- Approach
- An open single-subscription model, on public data, with a simulator.
- Result
- 82 out of 84 titles come out ahead
SaaS product · Jobs
A complete SaaS product, designed and launched in three days
- Problem
- Sorting job offers and preparing each application takes time.
- Approach
- A personalized daily digest, plus application support up to the interview.
- Result
- Designed and built in 3 days
SaaS product · Education
A toy-swapping platform for families, used by a pilot school
- Problem
- Toys sit in cupboards, and no platform is designed for a school.
- Approach
- A points system, in a closed community for each school.
- Result
- Live, used by a pilot school